Sunday, October 4, 2009

NACAA in Portland

Here we go. It was a packed 9-10 days. I'm trying to distill all the events down to give a feel for the events without overwhelming you all with a kazillion photos or interminable details. I'll take this day by day to give some direction.
Saturday morning was the only time it was rainy. This is the view from our balcony. The tall spire is where the Convention Center is. All the meetings, programs, auction, etc. took place here. You could walk to it in 10 minutes or ride the train. We got lots of walking in.




Our suite had lots of room. There was something happening every day or evening. This is the Wyoming/ Montana group, on Saturday, stuffing bags that they handed out for dinner Sunday evening. They cooked lamb, coleslaw, and corn on the cob. It was all good.

We also had the Arizona/New Mexico group in one evening to prepare stuff for breakfast on Thursday. There were several committee meetings, a couple of hospitality get-togethers, and the Spouse's Reception in this suite.



This photo is for Dana. Portland had lots of
trees and the houses are close together and it is
very green.











Monday - Dad went to meetings. The spouses
went across the Columbia to Vancouver, Washington.
We went to Fort Vancouver. It is 1-the original
Hudson Bay Company outpost, 2-a still active
Army Post (since 1854 or so), 3-a still active air
port since WWI. Interesting place.









This was the headquarters for the Hudson Bay Company. A grape vine grew across the front porch. You could smell the grapes.











Officer's Row for the US Army. However, the Army didn't want the upkeep. They worked out a deal with the city. The city has the buildings on the National Registry and they are leased out to corporations for office purposes. Some were built in 1880.



The air field does have a museum, however the National Guard unit was standing down after a tour overseas in the museum and we couldn't go in. All I could get is shots of the airplanes outside.


The beautiful Columbia River.












Monday evening was the 4-H Talent review and a performance by a group called the Ringling 5 from Montana. They were a group of ranchers who make up songs and perform on the side. They sing about a rancher's life and the events he has to deal with. All humorous. For one song, they called up two people out of the audience. They slapped well-worn hats on their heads and had them pull up their pant legs. The group then sang a song about "Rancher's legs". The chorus has something about "they have knock-knees and bowed legs and the their legs are blinding white". If you can't tell, that's Rick in the middle of the group with the hat down to his nose and his white legs bared for all to see. I was sorry the kids weren't there to see.




Tuesday- Dad had meetings. I took a spouse's tour up the Columbia to the Hood River valley, up around Mt. Hood and then back to Portland. This is Multnomah Falls. Very tall, very beautiful. Very Lord of the Rings.




I walked up across the bridge to an observation point below the main falls.












And there was a train. We had to cross under the tracks to get to our bus.











Mt. Hood dominates the horizon. This whole valley is filled with small orchards and farms. This is the pear capital of the US. They also grow some apples and cherries.







One farm we visited had changed from growing pears to doing a variety of different things. They had a u-pick operation that included strawberries and blueberries and rows and rows of flowers. These are dahlias. I've never seen such colors. They've also included a wine-tasting room and grapes and a winery. More money in booze than in pears.

















We went up to the Timberline Lodge on Mt. Hood. It was built by the WPA in the 30's. Beautiful building.























This door is huge and so well hung that a child can push it.


This chimney goes from the basement up through 4 floors to the outside.






















They told us that they have a booming ski business during the summer. The ski lifts take people up to the snow fields you can see. They get like 150 + inches of snow each winter. Maybe more, I can't remember.










Wednesday - Awards banquet and the passing of the gavel. The festivities in our room before the banquet was one of the details Dad and I struggled with. It is customary for the outgoing president to give gifts to the board. We settled on travertine coasters we stamped and painted. Kristy helped us find the directions on line. They turned out so well that Dad thinks we could sell them. Thanks, Kristy! Everyone liked them.





I don't have photos of the banquet. Trust me, the gavel passed to Phil Pratt and Dad started to relax.











Thursday - We toured small farms with diverse crops and produce across the Columbia in and around Vancouver, Washington.


This is an area that the city offered 20'x20' plots for people to garden. It was interesting to see what people planted.

















Part of this experiment in urban gardening included 2 acres of carrots. The hard part was that they weeded and were harvesting them by hand. The work was provided by volunteers and others doing community service. The carrots went to the local food bank.


















We saw a cow/calf operation.



















Another farm was 5 acres that had every foot planned out and used. They had lavender, blueberries, goats, and sheep. They sold raw goat milk, goat meat, yarn from their sheep, and a variety of preserves and other stuff that they made. We had lunch here that included "chevrie" or fresh goat cheese. The garlic cheese was pretty good.




































Another farm was getting ready for their Fall activities. They had a maze, pick your own pumpkins and a store with all kinds of pickles, preserves, jams, jellies, and cookies made from their produce.


They were harvesting Indian corn and laying it out to dry. The colors were beautiful.


They had rows of wheel barrows ready for their customers to pick up their pumpkins.


















Some of the pumpkins were pretty big.











We saw more goats and chickens at another farm.


















They had 5 acres that were set up as a co-op. One share was $530 and bought you a box of fresh produce for 20 weeks.










Friday - Dad had meetings. After packing boxes and some souvenir shopping, I went to the Chinese Garden in downtown Portland to take photos and draw. This garden is behind walls and takes a whole block. It's very quiet and peaceful inside.
















This is a lion dog that stands at the entrance to Chinatown.

















This is the jacuzzi in our suite. It was bigger than the one in Greensboro. Here we are floating "boats" and playing the storm game. Unfortunately, the turbulance was not as impressive as the one in Greensboro. Everything just moved around in a circle.















And that's a very brief overview of our trip. Portland is a very different place. We got a taste of using mass transit. We got to spend an hour in Powell's, a four-floor used and new bookstore. We got to see many people living on the street. Most of all, we got to make friendships with people from all over the country during the meetings and tours. We are looking forward to Tulsa, next July.











Sunday, September 13, 2009

We have walls!

This could rightly be called the Week of the Wallboard. We have done little since the beginning of the Labor Day weekend but put up insulation and hang wallboard, go to work, and snatch random moments to do necessary laundry and dishes and meals. And drink GALLONS of water. And shower morning and evening on some days. Trust me, you don't want to sleep covered in sweat and chalk dust.

Okay, before you can put up walls, you have to put everything in the walls that makes everything work, like electrical wiring, plumbing, and air conditioning ductwork. There are elves who do this for a living. You go to work in the morning. When you come home that evening, all this stuff has been stapled to studs and run over the rafters. And lots of little blue boxes sprout from the framing in strange places.



They even do showers stalls.

It is no fair that the crane to deliver the air conditioner came just as I had to go to work. I didn't get to watch!







How many men does it take to place an air conditioning unit? 5 - one for each side of the unit and one to drive the crane to place it on the roof.

After all the wall's insides are in place, it has to be inspected. Then we got to put up the insulation. This was last Saturday, Sep 5. Dad and Matt stapled insulation.

Then we took a break to properly celebrate Labor Day. Since we couldn't go to the wash, we did the next best thing and brought the wash to our backyard. Steak, dutch oven potatoes and dutch oven biscuits! Yummy!


Charcoal doesn't smell as good as juniper but it works just fine on the ovens.
Labor Day came and we really did. Our home teachers, Mark and Michael Smith came to help and spent the day with us putting up the ceiling. It took us all.


By the end of Monday, most of the ceiling was up.
We finished the rest of the ceiling Monday and then worked on the walls all week. We'd take an hour in the morning at 5:30 when it was light and then pick up again at 5:30 in the evening. Some nights we got a 2 - 3 hours in, some nights just 1-2. Yesterday, Sep 12, we worked from 7 to 6 and are almost finished. We need some studs in one corner to finish up.

Matt got to play the drills and dremel (wonderful, magical tool that lets you cut around the little blue boxes and other openings after the board is on the wall.). He got quite proficient at the whole lift and drill routine. Did you know there is a neat foot tool that you slide under the bottom edge of the wallboard and then you step on it and it pushes the board up and into place?
Bedroom
Bathroom
Kangaroo Matt! Note the pouches that are useful for holding screws, steel tape, exacto knife, pencil, chalk line, and the occasional drill. Be careful! If you touch him, you will be covered in a cloud of chalk dust.
This is after 10 hours as the drywall crew.

Dry wall by the numbers
1 thunderstorm that showed us there were still leaks in the roof before the drywall went up.
2 different drills needed to properly do the job
3 steel tapes. They would congregate in odd places and then get moved back to where they would be useful.
1 dremel. See above comment. Rusty's had a neat attachment that kept the bit at the correct height while you drove it around the boxes. Or wrote out your name in Chinese in a chunk of wallboard.
1 arrow used to push fiber insulation behind the shower walls. Dad spent most of Friday evening and Saturday morning doing this.
upteen kazillion square feet of wall board hung.

Sunday, August 23, 2009

Jeff n' Melanie's Party Part 2

I know, I know. Tomorrow turned into like two weeks. Just blame it all on school. And all the adventures we’ve been having, which is part of the story I’m going to tell. I just can’t decide how to organize it.

Let’s start with where we left off. The Casa Grande party. Jeff and Melanie came in Thursday evening. Lyn and Stacie and their kids arrived Friday. Riley got to raise the basketball standards.

Matt and Dana drove down from Provo Friday evening. (all by themselves!) We decorated Friday evening and Saturday morning. Melanie’s parents, Larry & Janie Bird, came to our house for lunch Saturday afternoon, when we served pit cook meat and various side dishes.

The party Saturday evening was low-key and fun. People came in a slow but steady stream all evening. Jeff said he got to visit with people he hadn’t seen in a long time. Grandad sang “Waltz Across Texas” and “Have I Told You Lately That I Love You?” to the newlyweds.

He also got to dance with his newest granddaughter. It was fun and everything went well.

Everyone was gone after church on Sunday. We were glad they all got home safely. We’re really glad they took so much of the leftovers with them. I finally got the broccoli in the freezer Thursday night. We still have cheese slices and peas in the fridge.

These are the centerpieces we put on the tables. There's a small LED light and some filler stuff like Easter grass in the bowl surrounded by birds and kisses.

There are colored lights in the plants and in the swags. Dad and Jeff draped colored lights from the crown moulding on the long sides of the room. It all looked very nice when we were done. The colored lights were more summery than white lights would have been.

So we're back to having only Matt at home and school and work and the addition to the house and Portland and yearbook and . . .

Our Adventures in Plumbing

First, We have outside walls, windows and doors. Dad and I framed around the windows and Matt finished up on the doors. We still have framing to put on the outside corners. The plumbers came Monday, Aug 17. They did preliminary work which involved moving all my stuff out of the master closet (attic access) and clearing everything out of the utility area (except the appliances) so they could access those pipes. Tuesday, they put in the lines in the addition.


Kitchen sinkWash roomPart of this job involved putting in new plastic lines for whole house so we aren’t using galvanized pipe anymore. We put in the piping in the new kitchen and the plumber was to tie it into the new stuff. He was also to repipe the washer/dryer area and put in a new front faucet outside. Part of the question was whether we had put in plastic when we redid the master bath and redid the bath in the kid’s bathroom. We were sure we did, but the plumber couldn’t find the pipes in the attic, So Wednesday, they began to look for the bathroom pipes in earnest. This involved cutting holes in the walls to determine what kind of piping we had. I came home from school to find five holes in various walls.

Front faucet - living roomUtility room
Kid's bathroom plus 2 in the master bath shelves.



We will put the pieces back in the walls and tape and texture and repaint. Friday, the plumber was back to install new bath exhaust fans in both bathrooms. The final result? We now have no galvanized pipe in the water system. The fridge ice machine is chuckling away at keeping the bin full and we have decent water pressure again. The electrician comes Monday or Tuesday.

It Rained! In the House!!!!

You’re never sure how good the new roofing job is until it rains. We were glad there was no rain while the roof was open to the sky. We heaved a big sigh of relief once the shingles were on and tied into the old roof. Then it rained Thursday evening. We had drips in the master bedroom along the first beam. It wasn’t too bad. The roofers came out and did some stuff. We were set. Saturday morning at 4 am, we woke to rain and drips in our bedroom. This time it was on the second beam and was pretty steady. We had to move the bed and set out a line of buckets to catch drips and towels to catch splashes. We also discovered a very large damp spot, with some drips in girl’s room. We moved most of the books off the top self and all the boxes and other stuff that were on the floor under the spot out of the bedroom.

The roofers came Saturday morning and worked on the roof. We hope it’s fixed. We worked on restoring order to some of the chaos. My clothes are now back in the closet. We sorted through three boxes of stuff from the utility room and some of that is back on the shelves. Some of the plumbing patches are back in place, but not taped yet.

I am realizing that in addition to the addition, we need to paint the rest of the house as well. No telling when that will get done.

Random stuff:

Flashlights found on the shelves of the utility area. Don’t know how many of them actually work.

The Great box migration

The adventure continues!!!!!